Can a pony wall be load bearing?

Pony Wall Construction Pony walls are constructed with two layers of reinforced concrete. The first layer consists of a base slab (or “base”) which is placed over the top of the foundation. The second layer consists of one or more reinforcing bars, spaced at intervals equal to the width between joists in the foundation slab. These reinforcement bars are usually placed along both sides and under each corner joist. The reinforcing bars act like a shock absorber against any vertical movement of the wall. They prevent the concrete from falling inward when it would otherwise buckle under its own weight. A Pony Wall is constructed using 2×4’s, but they can be made out of other materials such as stone, brick, wood or even metal. When building a pony wall you will need to make sure that there are no sharp edges because if there are then your pony wall could collapse due to a sudden lateral force. If you have a large enough area to work with, then you may want to use a combination of different materials. For example, you might choose to reinforce the wall with bricks instead of just using concrete blocks. You can also add additional supports such as wooden beams or steel pipes. Finally, if possible, try not to place any nails in the wall itself since these could cause damage if they come loose during normal use.

The first step is to check if the wall is load-bearing or not. This can be done by placing a 2×4 across the bottom of the wall and measuring to see how far it sinks into the floor. If the front of the 2×4 is flush with the bottom of the wall and does not sink in at all then it is load-bearing. Load-bearing walls require additional steps to be taken during the construction process.

After this, you will need to determine how wide you want your wall to be. Remember that you will need space on both sides so that humans can walk next to it. You will also need to leave space at the ends for doors and windows. After you have figured out the width, you can begin to place your first layer of blocks. The most common block size is 8″ x 16″. Arrange the blocks on their ends with their shorter sides facing the center. You will need to make sure that they are placed tightly against one another and that all of their corners are square with each other. Always use a level to check for plumb (that is, that it isn’t leaning one way or another). After completing the first layer, add your vertical reinforcement. For a pony wall, common sizes are 1″ x 2″ or 11/4″ x 4″. Space the vertical bars 6 to 8 inches apart and make sure that each corner has one. After the first layer has been completed, you can begin placing your second layer of blocks. Arrange these blocks in the same manner as you did with the first layer. Be sure to add another row of vertical reinforcement bars. In most cases, you will want to completely fill in the vertical space between the bottom row of blocks and the floor. It is very important that you keep everything plumb with each other. Placing some heavy object on the top layer can help you make sure that everything remains straight up and down. After both layers are placed, you can begin placing your cap or roof blocks. These blocks will cover the ends of the vertical reinforcement. They are placed on their narrow side so that they extend out over the vertical bars. Using a t-bevel, you can see how much longer you need to make each side, and then place them carefully over the verticals. After everything is plumb from front to back and side to side, you can remove the temporary 2×4 from underneath. For load-bearing walls, you must use engineered beams. These are placed to span between the tops of the verticals just as you would do with top and bottom rails on a regular wall. You can then place your blocks and fill in the gaps between them and the beams.

You can also build up instead of out. This is used primarily for privacy walls and garden fences. Since it is difficult to make the wall plumb, a common solution is to put a small wrought-iron or steel fence at the base. This is decorative and prevents people from jumping over the fence.

Planning and building codes will vary from town to town. Most places require a permit before you begin construction. They will also often require that you place your footer on crushed stone and then compact it before adding the rest of the dirt on top of it. This prevents ground water from seeping into your basement or crawlspace.

Many places also have minimum height requirements for basements and garages. This is usually for the safety of your water, gas, and electric lines. It is very important that you check with your local planning office before beginning any excavation.

THE FOLLOWING SECTION IS FROM THE ORIGINAL “HOMEBUILDER’S GUIDE” BY NOLAN RYAN

Foundation

The foundation of a house is the most important part because it literally bears the entire weight of the house. A poorly constructed foundation can lead to cracks in your house or even cause it to collapse. Take the time to do it right and you will not have to worry about your home for decades.

The most common type of foundation is a concrete pier and beam foundation. This consists of a large stone (or concrete block) that extends up from the ground and often has a cap on top to prevent water from getting in. This is then surrounded by reinforced concrete until the concrete is level with the ground. From there, posts can be drilled into the column or a beam can be placed on top of the column to support wood or steel beams that will in turn support the rest of the house.

can a pony wall be load bearing on remodelingmate.com

After determining where your footings will go, you must start digging them. This is done easiest with a power shovel (or back- breaking work with a pickaxe and shovel if you do not own one). If you have access to either, dig down at least 4 feet on each corner and 6 feet in the middle. Be sure to remove all rocks, roots, and other foreign materials as you dig.

This should expose the dirt around the base of your pier or beam. Check to see that there are no large bubbles in the dirt indicating a high water table (and thus a potential for flooding). If you still have any doubts, drill a 6-inch auger hole through the base of your pier or beam. Check to see if the soil is loose and wet, if it is you can pour a footing down first and then build up from there.

After checking your footings, fill them in with concrete. Plug in your concrete mixer, pour in some concrete and start it churning. Now shovel the cement into the hole and pack it down with a long 2×4. Be sure to lean on it pretty hard; you don’t want any air pockets.

Once the footing is filled, leave it alone for an hour or two.

Now that your footer is done, you can move onto whatever else needs to be done. If you have a large pier or beam, you may want to build a form (a wooden structure that creates a hollow space for the concrete to go in) and pour two sides at a time to speed up the process. Concrete dries very quickly so work as quickly but as thoroughly as you can.

If you’re using metal rebar, make sure you have someone on hand to weave it through the fresh concrete as it’s being poured. This can be difficult work so have a couple extra people around just to help with this task.

Your finished footer should look something like a smooth gray stone when it’s all done.

Now that your footer is finished, you can get started on building the rest of your house. Make sure to continue checking the concrete as it dries; you don’t want any cracks or weak spots. Keep a close eye on it for at least the first week or so.

Once it’s done, you can rest easy knowing that your house will be standing strong for decades to come.

Good Luck!

You can also check out How to Build a Platform for a Shed or Small Building if you need a little extra help. This article goes over some of the basics you’ll need for this project.

Sources & references used in this article: